factjuice
Animals  /  junin-rail

Facts about Junin rail

6 facts squeezed so far
  1. 06

    Crossing 59 bridges and 66 tunnels, the Junín Railway navigates through some of Peru's most treacherous terrain between Lima and La Oroya.

    Junin railMay 14engineeringinfrastructureperu
  2. 05

    Steam locomotives on the Junín Railway required special modifications including larger boilers and enhanced cooling systems to operate efficiently in the thin air above 4,500 meters elevation.

    Junin railMay 14engineeringtransportationaltitude
  3. 04

    Today's Central Railway of Peru operates the Junín line with 61 stations across its 248-kilometer route from Lima to La Oroya, serving remote Andean communities with essential connectivity.

    Junin railMay 14infrastructureperutransportation
  4. 03

    Approximately 2,000 workers died during construction of the Junín Railway between 1870 and 1908, primarily from altitude sickness and harsh mountain conditions.

    Junin railMay 14historyengineeringperu
  5. 02

    In 1870, Henry Meiggs won the contract to build the Junín Railway through Peru's Andes Mountains, employing thousands of workers over nearly four decades of construction.

    Junin railMay 14historyengineeringperu
  6. 01

    The Junín Railway in Peru, completed in 1908, reaches 4,781 meters altitude at La Oroya, making it one of the highest standard-gauge rail lines in the world.

    Junin railMay 14altitudeinfrastructureperu