Facts about Mir Construction Timeline

7 facts squeezed so far
  1. 07

    Kvant-2, Mir's second addition launched in November 1989, brought airlock capability and expanded the station's habitable volume by 40 percent over the initial Base Block.

    Mir Construction TimelineMay 14spaceflightengineering1980s
  2. 06

    Kristall, Mir's materials processing module, launched in June 1990 and featured two robotic arms for external experiments in microgravity crystal growth.

    Mir Construction TimelineMay 14spacetechnologyconstruction
  3. 05

    During 1987, the Kvant-1 astrophysics module became Mir's first addition, automatically docking to the Base Block and doubling the station's initial mass to approximately 20 metric tons.

    Mir Construction TimelineMay 14spaceconstruction1987
  4. 04

    Seven modules comprise Mir's final configuration: Kvant-1, Kvant-2, Priroda, Spektr, Soyuz TM, Kristall, and the Base Block core launched in 1986.

    Mir Construction TimelineMay 14spaceengineeringstructure
  5. 03

    Astronaut Valeri Polyakov spent 437 consecutive days aboard Mir from 1994 to 1995, setting the record for longest continuous human spaceflight during the station's operational years.

    Mir Construction TimelineMay 14spacehumanrecord
  6. 02

    In 1995, Mir's Spektr module suffered a collision with an unmanned Progress spacecraft during a docking experiment, breaching the station's hull and forcing the crew to seal off the damaged compartment.

    Mir Construction TimelineMay 14spaceaccidentengineering
  7. 01

    The Mir space station's construction spanned 10 years from 1986 to 1996, with the final module Priroda docking in April 1996 to complete the orbital complex.

    Mir Construction TimelineMay 14spacetimelinemeasurement