Facts about Mir Construction Timeline
- 07
Kvant-2, Mir's second addition launched in November 1989, brought airlock capability and expanded the station's habitable volume by 40 percent over the initial Base Block.
- 06
Kristall, Mir's materials processing module, launched in June 1990 and featured two robotic arms for external experiments in microgravity crystal growth.
- 05
During 1987, the Kvant-1 astrophysics module became Mir's first addition, automatically docking to the Base Block and doubling the station's initial mass to approximately 20 metric tons.
- 04
Seven modules comprise Mir's final configuration: Kvant-1, Kvant-2, Priroda, Spektr, Soyuz TM, Kristall, and the Base Block core launched in 1986.
- 03
Astronaut Valeri Polyakov spent 437 consecutive days aboard Mir from 1994 to 1995, setting the record for longest continuous human spaceflight during the station's operational years.
- 02
In 1995, Mir's Spektr module suffered a collision with an unmanned Progress spacecraft during a docking experiment, breaching the station's hull and forcing the crew to seal off the damaged compartment.
- 01
The Mir space station's construction spanned 10 years from 1986 to 1996, with the final module Priroda docking in April 1996 to complete the orbital complex.